Section I.
Description and Use of Controls and Indicators
. . . . . . . . . . . . . . . . . . . .
2 - 2
2.1
Generator Set 150 kW, Control Cabinet Assembly. . . . . . . . . . . . . . . . . .
2 - 2
2.2
Pallet Frame, Power Distribution Unit. . . . . . . . . . . . . . . . . . . . . . . . . . . .
2-12
2.3
Electric Power Plant III, Cabling Connections. . . . . . . . . . . . . . . . . . . . . .
2-18
2.4
Electric Power Plant III, Fire Extinguishers. . . . . . . . . . . . . . . . . . . . . . .
2-20
Section II.
2.5
Operator Preventive Maintenance Checks and Services (PMCS) . . . . .
Introduction to Operator PMCS Table . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Section III.
Operation under Usual Conditions
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32
2.6
Assembly and Preparation for Use
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
32
2.7
Operating Procedures
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
43
2.8
Preparation for Movement
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
63
Section IV
Operation under Unusual Conditions
-
. . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2
70
2.9
Operating Generator Set 160 kW
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
70
2.10
Operating Electric Power Plant III
2 -
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
76
2 - 22