TM 9-6115-669-13&P
6.6 PDU POWER CABLE, ONE PHASE MAINTENANCE.
This task covers:
a.
d.
Removal
b.
Inspection c.
Test
Repair
e.
IInstalla-
tion
INITIAL SETUP
Tools
Equipment Conditions
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair,
Tool Kit
(item 3, appendix B)
High voltage tester
Wrench, shop manufactured
(item 10, appendix B)
Circlip pliers
Load Bank (item 23, appendix B)
Materials/Parts
Cable ties
(item 2, appendix E)
Lubricant
(item 6, appendix E)
Reference
Shut down Generator Set
150 kW, paragraph 26.1.
Personnel Required
Two
WARNING
The Generator Sets 160 kW produce lethal voltages.
Turn off power to the EPP III or Generator Set 160 kW before
performing any installation, removal, disassembly, or
assembly work.
Wear protective gloves when performing any work on main
assemblies of the EPP III.
CAUTION
Label all cables before removing electrical or electronic assemblies or
components.
N O T E
The Power Distribution Unit must be reomved before this maintenance.
Refer to paragraph 4.19.