TM 9-6115-669-13&P
4.24 LIGHT INDICATOR ASSEMBLY MAINTENANCE.
This task covers:
a.
Removal
b.
Installation
General Mechanic's Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair, Tool
Kit (item 3, appendix B)
Reference
Shut down Generator Set
150 kW,
paragraph 2.8.1.
None
T w o
WARNING
The Generator Sets 150 kW produce lethal voltages.
Turn off power to the EPP III or Generator Set 150 kW before
performing any installation, removal, disassembly, or
assembly work.
Wear protective gloves when performing any work on main
assemblies of the EPP III.
CAUTION
Label all cables, before removing electrical or electronic assemblies or
componenta.
a.
b.
C.
d.
e.
f.
g.
h.
i.
j.
This procedure is the same for all light indicators H1 to H9 and H11
(Example H1).
Remove stanchion by PDU (1, figure 4-38).
Open access door (2) and secure with prop (3).
Install stanchion.
Open indicator panel cover (4).
Record labeling and position of cables to bulb holder (6).
Remove cables from terminals.
Use a screwdriver to push in closure (7) first using your hand to support the bottom of the
bulb holder (6) until they snap in, and remove bulb holder (6) with bulb (10).
Loosen screws (8) on base (9).
Unlock lamp cap (11, 12, 13) from front of panel, by turning counterclockwise.
Pull lamp cap (11, 12, 13) out of front of panel, and remove base (9) from back of panel.
4-82
![](//www.tpub.com/assessment.jpg)