TM 9-6115-669-13&Pe.f.g.h.i.j.k.l.m.WARNINGDo not stand in the operating area of the crane. Do not walkunder the suspended loadThe lifting height of the crane must be sufficient to place thepallet frame easily onto the truck bed.When moving the pallet frame with the crane, proceed slowlyso the frame remains horizontal.Move pallet frame (5) so it is centered over the truck platform.Lower pallet frame to about 4 inches (10 cm) above platform, and suspend it so frame member(6) site in guide mandrel (4).Lower the frame all the way. The two guide mandrels in position (3, 7) locate the framediagonally.For complete accessibility, move the folded down side panels back up to horizontal. Remove thecrane and sling assembly Mount the sling assembly on the pallet frame.Insert threaded bushings (9, figure 4-25) from below into the two diagonally oppositemounting points that are still unoccupied. Push stud (8) through and secure with spring pin(6).Install the two diagonal tightening assemblies (13).Coat the threads of bolt (10) with Loctite 243 and install using serrated washer (11) andwasher (12), onto threaded bushing (9). Tighten bolt (10) to a torque value of 176.88 ft-lb (240Nm).Pull out the two guide mandrels (4, figure 4-28) one after the other, and install the remainingtightening assemblies as instructed in steps i. through k.Install ground strap (1, figure 4-25), washer (4) and serrated washer (3), and secure with nut(2). Torque nut (2) to a torque value of 14.74 ft-lb (20 Nm). Apply terminal grease to threadedconnection (5).n. Install Generator Set 150 kW as instructed in paragraph 4.17.4-63
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business