m.
WARNING
Do not stand in the operating area of the crane. Do not walk
under the suspended load
The lifting height of the crane must be sufficient to place the
pallet frame easily onto the truck bed.
When moving the pallet frame with the crane, proceed slowly
so the frame remains horizontal.
Move pallet frame (5) so it is centered over the truck platform.
Lower pallet frame to about 4 inches (10 cm) above platform, and suspend it so frame member
(6) site in guide mandrel (4).
Lower the frame all the way. The two guide mandrels in position (3, 7) locate the frame
diagonally.
For complete accessibility, move the folded down side panels back up to horizontal. Remove the
crane and sling assembly Mount the sling assembly on the pallet frame.
Insert threaded bushings (9, figure 4-25) from below into the two diagonally opposite
mounting points that are still unoccupied. Push stud (8) through and secure with spring pin
(6).
Install the two diagonal tightening assemblies (13).
Coat the threads of bolt (10) with Loctite 243 and install using serrated washer (11) and
washer (12), onto threaded bushing (9). Tighten bolt (10) to a torque value of 176.88 ft-lb (240
Nm).
Pull out the two guide mandrels (4, figure 4-28) one after the other, and install the remaining
tightening assemblies as instructed in steps i. through k.
Install ground strap (1, figure 4-25), washer (4) and serrated washer (3), and secure with nut
(2). Torque nut (2) to a torque value of 14.74 ft-lb (20 Nm). Apply terminal grease to threaded
connection (5).
n. Install Generator Set 150 kW as instructed in paragraph 4.17.
4-63