TM 9-6115-669-13&P
WARNING
Ensure lifting rings (10, figure 4-21) are properly installed
and are in the proper position (up) for lifting.
Do not stand in the operating area of the crane. Do not walk
under thesuspended load.
The lifting height of the crane must be sufficient to lift the
Generator Set 150 kW easily off the truck bed
When moving the Generator Set 150 kW with the crane,
proceed slowly so the Generator Set 150 kW remains
horizontal.
CAUTION
Do not damage PDU cable (10, figure 4-22) during lifting of the Generator
Set 150 kW.
h. Thread lifting rings (10, figure 4-21) all the way into the sling points, engage the four cable
hooks of the sling assembly (2, figure 4-22) in the lifting rings. Lift the Generator Set 150 kW
with the crane, and lower it onto a solid surface.
4-47