TM 9-6115-669-13&P
2.7.6 External connections.
2.7.6.1 External loads.
During operation, external loads can be connected to the connection panels of the Generator Set 150
kW and EPP III PDU (figure 2-23). This requires appropriate circuit breakers of the internal power
sources are switched on.
Item
Receptacle
Number
1
J1/120 V 400 Hz double receptacle
2
J2/24 V receptacle
3
J11 120 V 400 Hz double receptacle
4
J12 24 V receptacle
2.7.6.2 Battery connection
Loads
Circuit breaker
16 A maximum
F11 (paragraph 2.1.2)
6 A maximum
F2 (paragraph 2.1.2)
16 A maximum
F8 (paragraph 2.2.2)
6 A maximum
F2 (paragraph 2.2.2)
Battery connection between the two generator battery sets can be made, if the battery of one
generator set fails or is not present.
Figure
2-4
Receptacle
J3 SLAVE RECEPTACLE 24
VOLTS
Loads
Connection
500 A maximum
Battery cable
2.7.6.3 Voice communication.
Voice communication is possible between the ECS and EPP III at any time, even when shut down
generator sets 150 kW (figure 2-23). Connection from EPP III to ECS can be made by using the
control cable and two headsets.
Item
Receptacle
Connection
Number
Figure 2-12
5
J7-PHONE JACK receptacle
Headset
6
J5-CONTROL receptacle
Control cable (table
1-5)
N.I.
Corresponding receptacle at the ECS end
Control cable (table
1-5)
N.I.
Corresponding receptacle at the ECS end
Headset
2 - 59