TM 9-6115-669-13&P2.7 OPERATING PROCEDURES.When operating the EPP III ensure all personnel are wearinghearing protection. Failure to observe this warning couldresult in severe personal injury due to loss of hearing.Do not operate the generator sets unless all groundingprovisions are properly and securely connected Electricalfaults in the generator sets, load lines, or load equipment cancause severe personal injury or electrocution from contactwith the ungrounded system.If operating the EPP III with only one generator setinstalled, insure that all cables for the missing generator sethave protective covers installed prior to starting theremaining generator set.Potential 208 VAC shock hazard. Do not disconnect orconnect control or power cables while generator set 1 or 2 isrunning.Always install protective covers on control and power cableswhen cables are disconnected.CAUTIONBefore operating the generator sets, check the voltage and frequencyrequirements of the load against the voltage and frequency rating ofthe generator sets. If the voltage and frequency requirements do notmatch the generator sets ratings, DC NOT attempt to operate thegenerator sets.When they are deployed, cables and exhaust extensions lie on thewalkway and create a hazard to walking. Care should be exercisedwhen on the walkways to avoid falls and possible injury.2.7.1 General operating procedure.CAUTIONAll Generator Sets 150 kW PMCS must be accomplished prior to startingthe engine (refer to TM 9-6115-668-13).All operations are controlled from the control panels (1 to 3, figure 2-17):Switch on the generator sets at control panel (1).Activate the RS and ECS loads at control panel (3).Perform switching operations and observe operations at control panels (1 to 3).The general operating procedure is described in table 2-10.2 - 4 8Change 1
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business