Installation.
Removal.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Tag and disconnect battery and stave receptacle cables from slave receptacle (7, FIGURE 2-4) by removing
bolts (1) and Iockwashers (2).
Remove bolts (5), nuts (6), and NATO slave receptacle (7) from generator set housing.
Remove nut (8), bolt (9), and cover (1 0) from generator set.
Insert NATO slave receptacle (7, FIGURE 2-4) into generator set housing.
Secure receptacle (7) with bolts (5) and nuts (6).
Connect slave receptacle and battery cables to slave receptacle (7) with bolts (1) and Iockwashers (2). Remove
tags.
Install cover (10) on generator set with bolt (9) and nut (8).
Connect negative battery cable. Close battery access door.
S e c t i o n I X . M A I N T E N A N C E O F H O U S I NG
2-14 ACCESS DOORS.
2-14-1
a.
b.
c.
d.
e.
f.
g.
h.
i.
2-34
NOTE
This procedure is written for the left rear engine access door, but is typical for all ac-
cess doors, hinges, latches, storage boxes, and data plates.
NOTE
When removing and installing battery access door, note position of spacers for door
hold open mechanism.
Removal
Shut down generator set.
Open left side engine access doors.
Remove nuts (1, FIGURE 2-5), Iockwashers (2), bolts (3), washers (4), and hinges (5).
Remove left rear engine access door (6) from generator set.
Remove assembly nuts (7), bolts (8), and document box (9) from engine access door (6).
Drill out rivets (10) and remove fuel system diagram (11 ) from document box (9).
Remove assembled nuts (12), hits (13), bracket (14), and holding rod (15) from engine access door (6).
Remove assembled nuts (16), bolts (17), and bracket (18) from engine access door (6).
Remove nuts (19), screws (20), and latches (21 ) from engine access door (6).