ARMY TM 9-6115-641-24
AIR FORCE TO 35C2-3-456-12
Table 2-5. Unit Preventive Maintenance Checks and Services - Continued
M-Monthly
Q-Quarterly
S-Semi-annually
A-Annually
B-Bi-annually
H-Hours
Item
No.
5
6
7
8
9
.
Interval
M
Q
S
A
B
H
Item
to be
Inspected
Air Cleaner
Assembly
Hardware
and sound
Insulation
Radiator and
Interior of
Generator
Set
Magnetic
Pickup
Procedures
Check for and have
repaired or
adjusted as
necessary
Remove batteries.
Refer to paragraph
2-12-2. Clean
batteries, cable
terminals, and
battery posts. Test
batteries for state
of charge. Refer to
paragraph 2-12-1.
Inspect air cleaner
assembly and
mounting bracket
for cracks, dents, and
other damage.
Inspect element for
dogs and damage.
Clean or replace as
necessary. Clean
housing with cleaning
cloth.
Inspect for loose,
damaged, or missing
hardware and sound
insulation. Tighten
loose hardware.
Reapir or replace
damaged or missing
hardware and
insulation.
Clean radiator
exterior surfaces.
Refer to paragraph
2-70-3. Clean
engine compartment.
Remove, inspect, and
dean magnetic
pickup. Refer to
paragraphs NO TAG
and NO TAG.
Equipment is
not
Ready/Available
If:
Batteries will not
hold charge.
Loose, missing,
or damaged
hardware or
insulation.
Magnetic pickup is
damaged.
2-9
Batteries
