TM 5-6115-630-14&P
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (cont).
B Before
D During
A After
W Weekly
M - Monthly
Interval
Item to be inspected.
Item
Procedure: check for and have repaired,
Equipment is not
no.
B
D
A
W
M
filled, or adjusted as needed
ready/available if:
27
l
FIRE EXTINGUISHER
Inspect and weight fire extinguisher.
(See paragraph 3-12.)
28
l
TRAILER FRAME
Inspect entire chassis frame for damage, cracks,
Frame is obviously broken
and broken welds.
broken or cracked.
Section IV. TROUBLESHOOTING
3-10. Power Unit Troubleshooting. There are no troubleshooting procedures authorized at operator level
for the power unit end item. Troubleshooting procedures for the individual generator set and trailer are contained
in their respective technical manuals referenced below.
a.
Generator Set Troub leshooting. Refer to TM 5-6115-584-12 for troubleshooting procedures.
b. Trailer Troubleshooting. Refer to TM 9-2330-202-14&P for troubleshooting procedures.
Section V. OPERATOR/CREW MAINTENANCE
3-11. Enclosure Maintenance. Maintenance of the enclosure at operator level is limited to replacement of
the fitted cover and/or the bows.
a. Fitted Cover Replacement . (See figures 3-1 and 3-2.)
(1) Rermoval.
(a) Untie 27 ropes
(1, figure 3-1) fastening fitted cover to trailer body (2).
Roll up curtain, and secure with three
Roll up curtain, and secure with three
(b) Unfasten six straps and buckles (3) securing rear curtain (4).
rollup straps (5) provided.
(c) Unfasten six straps and buckles (3) securing front curtain (6).
rollup straps (5) provided.
(d) Roll up each side (7) of fitted cover, in turn, and secure each side with four rollup straps (5) provided.
3-17