TM 5-6115-628-14&P
(1) Removal.
(a) Remove 18 screws (1, figure 4-15),18 Iockwashers (2), and 18 flat washers (3)
securing rear cover (4) to switch box (5) and remove cover.
(b) Disconnect connector cable assembly wires (6) from load terminal L0, GROUND
TERMINAL stud, and associated switch.
(c) Remove four screws (7) and four nuts (8) securing connector flange (9) to switch
box (10).
(d) Carefully remove connector and associated wiring from switch box.
(2) Installation.
(a)
(b)
(c)
(d)
washers (2), and 18 flat washers (3).
Feed connector cable assembly wires (6) through mounting hole in switch box (10).
Position connector body in mounting hole and secure with four screws (7) and four nuts
(8). Use screw in lower right-hand corner of flange to secure connector cap retaining
chain (11).
Install connector cable assembly wires (6) on load terminal L0, GROUND TERMINAL
stud, and associated switch (figure 4-14).
Position rear cover (4) on switch box (5) and secure with 18 screws (1). 18 lock-
Figure 4-15. Connector Replacement.
b. Load Terminal Replacement. (See figure 4-16.) The switch box load terminals provide
electromechanical connection points between the system or equipment being powered and the power
plant. In addition to the four output terminals, the switch box utilizes a fifth load terminal as a ground
connection for the system or equipment being powered.
4-31
