TM 5-6115-628-14&P
Section Vlll. MAINTENANCE OF POWER PLANT TRAILERS
4-17.
General. This section of the manual contains unit level maintenance procedures for compo-
nents of the M200A1 trailer added when the trailer is used as part of the AN/MJQ-15 power plant.
These components are not covered in the overall trailer maintenance manual. For all other unit
maintenance procedures on the trailer, refer to TM 9-2330-205-14&P.
WARNING
Before performing any maintenance that requires climbing on or under trailer,
set trailer handbrakes, chock both wheels, and lower rear leveling jacks.
Injury to personnel could result from trailer suddenly rolling or tipping.
4-18.
Fuel Can Bracket Replacement. (See figure 4-5.) There are four fuel can brackets supplied
with the AN/MJQ-15. Two brackets are mounted on top of the curbside front steps on each power unit.
Replacement procedures described below are typical for all.
a. Removal.
(1) Remove four screws (1, figure 4-5), four nuts (2) and four flat washers (3) securing
bracket (4) to step (5).
(2) Remove bracket (4) from step (5).
4-16
Figure 4-5. Fuel Can Bracket Replacement.