OPERATION OF WINTERIZATION KIT
The winterization kit can be used at temperatures below 30F (1.1C).
NOTE
If temperatures are below 30F (1.1C), winterization kit may require 30 to 60 minutes to warm the
engine up to starting temperature.
1.
Perform INITIAL ADJUSTMENTS BEFORE USE AND SELF-TEST procedures (WP 0006 00-10).
2.
Open right front access doors and verify that winterization kit coolant valves (1) are open.
3.
4.
On winterization kit control panel, press in CIRCUIT BREAKER.
5.
On FUEL FIRED HEATER CONTROL, set switch to ON to energize fuel-fired heater.
6.
On EMCP set ENGINE CONTROL switch to COOL DOWN/STOP.
7.
On GSC keypad press ENGINE METER key and observe coolant temperature. Generator set can be started when
coolant temperature reaches 120 F (49C).
8.
After starting the TQG, set switch to OFF. The combustion air blower and water pump will continue to run for
approximately 3 minutes.
END OF TASK