TM 9-6115-729-24
0091
ASSEMBLY - Continued
4. Install control box cover (Figure 1, Item 22) on control box frame (Figure 1, Item 10) with two screws (Figure
1, Item 21).
5. Install toggle switch (Figure 1, Item 20) on control box faceplate (Figure 1, Item 9) with jam nut and
lockwashers (Figure 1, Item 19).
6. Install circuit breaker (Figure 1, Item 18) on control box faceplate (Figure 1, Item 9) with jam nut and
lockwashers (Figure 1, Item 17).
7. Install press-test indicator light (Figure 1, Item 16) on control box faceplate (Figure 1, Item 9) and install jam
nut and lockwashers (Figure 1, Item 15) and lens cap (Figure 1, Item 14).
8. Install LED holder (Figure 1, Item 13) on control box faceplate (Figure 1, Item 9) and install jam nut and
lockwashers (Figure 1, Item 10) and collar (Figure 1, Item 11).
9. Install control box faceplate (Figure 1, Item 9) and control box mounting bracket (Figure 1, Item 8) on control
box frame (Figure 1, Item 10) with two screws (Figure 1, Item 7).
END OF TASK
INSTALLATION
1. Install winterization heater control box assembly (Figure 1, Item 6) on rear of generator housing and secure
with two washers (Figure 1, Item 5), lockwashers (Figure 1, Item 4), and screws (Figure 1, Item 3).
2. Connect connector P27 to connector J27 (Figure 1, Item 2) and connector P26 to connector J26 (Figure 1,
Item 1).
3. Close left rear doors.
END OF TASK
END OF WORK PACKAGE