TM 9-6115-729-24
0066
INSTALLATION - Continued
10. Connect hose (Figure 1, Sheet 1, Item 8) from coolant recovery system (Figure 1, Sheet 2, Item 6) (under
surge tank) to drain tee (Figure 1, Sheet 1, Item 9) using hose clamps (Figure 1, Sheet 1, Item 7) and
(Figure 1, Sheet 2, Item 7).
11. Connect hose (Figure 1, Sheet 1, Item 4) from radiator filler neck (Figure 1, Sheet 2, Item 5) to coolant
recovery system (Figure 1, Sheet 2, Item 6) using hose clamps (Figure 1, Sheet 2, Item 3).
12. Close drain valve (Figure 1, Sheet 1, Item 2) and drain valve (Figure 1, Sheet 1, Item 1).
13. Refill cooling system with coolant.
14. Close right front door and left front door.
15. Bring generator set to operating temperature and check for leaks.
16. Check coolant and fill as required.
END OF TASK
END OF WORK PACKAGE
0066-6