TM 9-6115-729-24
0041
INSTALLATION
1. If previously removed, install brace (Figure 1, Item 21) using two screws (Figure 1, Item 18), lockwashers
(Figure 1, Item 19), and washers (Figure 1, Item 20).
2. Slide control box (Figure 1, Item 17) fully into generator set.
3. Install five screws (Figure 1, Item 14), lockwashers (Figure 1, Item 15), and washers (Figure 1, Item 16).
4. Install two screws (Figure 1, Item 11), lockwashers (Figure 1, Item 12), and washers (Figure 1, Item 13).
5. Install three screws (Figure 1, Item 8), lockwashers (Figure 1, Item 9), and washers (Figure 1, Item 10).
6. Install seven screws (Figure 1, Item 5), lockwashers (Figure 1, Item 6), and washers (Figure 1, Item 7).
7. Install ground wire (Figure 1, Item 1) to back of control box terminal (Figure 1, Item 4) with washer (Figure 1,
Item 2) and locknut (Figure 1, Item 3).
8. Remove tag and connect ECM to EMCP harness connector ENG-P37 to control box connector J37.
9. Remove tag and connect harness connector P31 to control box connector J31.
10. Remove tag and connect harness connector P30 to control box connector J30.
END OF TASK
END OF WORK PACKAGE
0041-14