7. Install track (Figure 2, Sheet 4, Item 83), three washers (Figure 2, Sheet 4, Item 90), three screws (Figure 2,
Sheet 4, Item 89), three nuts (Figure 2, Sheet 4, Item 88), two clips (Figure 2, Sheet 4, Item 87), two insulator
blocks (Figure 2, Sheet 4, Item 86), two washers (Figure 2, Sheet 4, Item 85), and two screws (Figure 2,
Sheet 4, Item 84).
8. Install socket (Figure 2, Sheet 4, Item 82), relay PAR (Figure 2, Sheet 4, Item 81), and spring (Figure 2,
Sheet 4, Item 76).
9. Install socket (Figure 2, Sheet 4, Item 80), relay DBLO (Figure 2, Sheet 4, Item 78), and spring (Figure 2,
Sheet 4, Item 76).
10. Install socket (Figure 2, Sheet 4, Item 77), relay KFF (Figure 2, Sheet 4, Item 75), GFR (Figure 2, Sheet 4,
Item 74), AR (Figure 2, Sheet 4, Item 73), AFPR (Figure 2, Sheet 4, Item 72), CDR (Figure 2, Sheet 4, Item
71), KR (Figure 2, Sheet 4, Item 70), and spring (Figure 2, Sheet 4, Item 76).
11. Install screw (Figure 2, Sheet 3, Item 69), nut (Figure 2, Sheet 3, Item 67), two washers (Figure 2, Sheet 3,
Item 68), and nut (Figure 2, Sheet 3, Item 67).
12. Install component mounting channel (Figure 2, Sheet 3, Item 63), five washers (Figure 2, Sheet 3, Item 66),
lockwashers (Figure 2, Sheet 3, Item 65), and screws (Figure 2, Sheet 3, Item 64).
13. Install screw (Figure 2, Sheet 3, Item 62), nut (Figure 2, Sheet 3, Item 61), loop clamp (Figure 2, Sheet 3,
Item 60), and nut (Figure 2, Sheet 3, Item 61).
14. Install lower transformer mounting bracket (Figure 2, Sheet 3, Item 55), two washers (Figure 2, Sheet 3, Item
59), two lockwashers (Figure 2, Sheet 3, Item 58), two screws (Figure 2, Sheet 3, Item 57), and nut (Figure 2,
Sheet 3, Item 56).
15. Install upper transformer mounting bracket (Figure 2, Sheet 3, Item 50), two washers (Figure 2, Sheet 3, Item
54), two lockwashers (Figure 2, Sheet 3, Item 53), two screws (Figure 2, Sheet 3, Item 52), and nut (Figure 2,
Sheet 3, Item 51).
16. Install AC transformer box A5 (Figure 2, Sheet 3, Item 45), four washers (Figure 2, Sheet 3, Item 49), four
lockwashers (Figure 2, Sheet 3, Item 48), four screws (Figure 2, Sheet 3, Item 47), and three fuses (Figure 2,
Sheet 3, Item 46). Record barcode values for VA, VB, VC, IA, IB, IC (setpoints AC01 thru AC06) for
reprogramming. GSC. Setpoints must be reprogrammed if AC transformer box A5 is replaced (WP 0080).
17. Install ground fault circuit interrupter GFCI (Figure 2, Sheet 3, Item 42), two screws (Figure 2, Sheet 3, Item
44), and nuts (Figure 2, Sheet 3, Item 43).
18. Install nameplate (Figure 2, Sheet 2, Item 40), (Figure 2, Sheet 2, Item 39), or (Figure 2, Sheet 2, Item 38)
and two rivets (Figure 2, Sheet 2, Item 41).
19. Install paralleling receptacle (Figure 2, Sheet 2, Item 34), cover (Figure 2, Sheet 2, Item 37), four screws
(Figure 2, Sheet 2, Item 36), and four nuts (Figure 2, Sheet 2, Item 35). Repeat for other paralleling
receptacle.
20. Install duplex receptacle (Figure 2, Sheet 2, Item 31), cover (Figure 2, Sheet 2, Item 33), and four screws
(Figure 2, Sheet 2, Item 32).