ARMY TM 9-6115-672-14
AIR FORCE TO 35C2-3-444-32
MARINE CORPS TM 09244A/09245A-14
5-45
b. Installation.
(1)
Position generator shock mounts (26, Figure 5-8) in skid base.
(2)
Install bolts (23), nuts (25), washers (24), washers (22) and nuts (21) on generator mounts.
__________
WARNING
Rated capacity of overhead hoist should be at least 1,000 lbs. (454 kg.)
Using a hoist with less capacity could result in equipment damage, personal
injury or death.
(3)
Attach lifting harness to overhead hoist and generator lifting eye.
(4)
Position generator on skid base aligning mounting holes with mounts and engine flywheel
housing.
(5)
Install bolts (13), washers (14), and lockwashers (15). Tighten bolts (13) slowly to ensure even
and proper seating of generator case lip to engine flywheel housing. Torque bolts to 25 lbs.-ft
(34 Nm).
(6)
Install bolts (19), Belleville washers (20), snubbing washers (18), washers (17), and nuts (16)
securing generator to skid base. Torque nuts (16) to 210 lbs-ft. (285 Nm).
(7)
Install bolts (11) and washers (12) securing generator drive disc to engine flywheel. Torque
bolts (11) to 35 lbs-ft.(47 Nm).
(8)
Install screen band (10) on generator case with screws (8), washers (9), lockwashers (7), and
nuts (6).
(9)
Adjust nuts (21) on generator mount, to obtain 0.5 in. (12.7 mm) minimum clearance between
ends of bolts (23) and skid base. Torque nuts (21) to 150 lbs.-ft. (203 Nm).
(10) Loosen nut (31), adjust bolt (32) until 0.25 in. (6.4 mm) protudes past contact support frame
(33). Tighten nut (31).
(11) Install rear forklift guide. Refer to paragraph 5.11.1.
(12) Install load terminal board, paragraph 4.12.8.
(13) Install rear housing section, paragraph 4.8.5.
(14) Install output box assembly, paragraph 5.8.1.
(15) Connect negative battery cable to battery, and close BATTERY ACCESS door.
(16) Start generator set, paragraph 2.11.1. Check for proper operation.
