ARMY TM 9-6115-672-14
AIR FORCE TO 35C2-3-444-32
MARINE CORPS TM 09244A/09245A-14
5-17
(41) Remove bolt (52), washer (53), bolt (50), washer (51) and rear engine lifting bracket (54) from
engine.
(42) Remove bolts (47), lockwashers (48), and front engine lifting bracket (49) from engine.
(43) Remove jamnuts (18), washers (19), washers (21), jamnuts (22), and bolts (20) from generator.
(44) Remove bolts (25), lockwashers (26), washers (27), and engine supports (28) from engine.
(42) Remove locknuts (29), washers (30), bolts (31) and engine mounts (32) from skid base.
b. Installation.
(1)
Install engine mounts (32, Figure 5-1), bolts (31), washers (30), and locknuts (29) on skid base.
(2)
Install engine supports (28), washers (27), lockwashers (26), and bolts (25) on engine.
(3)
Install bolts (20), jamnuts (22), washers (21), washers (19), and jamnuts (18) on generator.
(4)
Install front engine lifting bracket (49) lockwashers (48), and bolts (47) to engine.
(5)
Install rear engine lifting bracket (54), lockwasher (53), bolt (52), washer (51), and bolt (50) to
engine.
(6)
Position shock mounts (24) at generator mounting points on skid base.
CAUTION
Rated capacity of overhead hoist should be at least 2000 lbs (907 kg).
Arrange lifting device so that it supports both engine and generator to
avoid undue stress on the engine and generator coupling. Failure to comply
can cause damage to equipment.
(7)
Attach lifting harness to engine and generator lifting points. Raise engine and generator
assembly from maintenance stand or fixture.
(8)
Position engine and generator assembly on skid base with mounting holes and brackets aligned.
(9)
Cut cable ties from generator power leads (55).
(10) Secure generator to skid base with snubbing washers (15 and 23), Belleville washers (17), bolts
(16), washers (14), and locknuts (13). Torque bolts to 210 ft-lb (284.9 Nm).
(11) Secure engine supports (28) to skid base with washers (12), bolts (11), snubbing washers (10),
washers (9), and locknuts (8). Torque locknuts to 75 ft-lb (101.7 Nm).
(12) Install bolts (5), washers (6), lockwashers (4), nuts (3), and support frame (7).
(13) Install right and left side generator housing panels.
(14) Connect main output terminal board ground strap to skid base.
