TM 9-6115-669-13&P
WARNING
Ensure lifting rings (10, figure 4-21) are properly installed
and are in the proper position (up) for lifting.
Do not stand in the operating area of the crane. Do not walk
under the suspended load.
The lifting height of the crane must be sufficient to lift the
Generator Set 150 kW easily off the truck bed.
When moving the Generator Set 150 kW with the crane,
proceed slowly so the Generator Set 150 kW remains
horizontal.
d. Thread lifting rings (10) all the way into the sling points, engage the four cable hooks of the
sling assembly (2, figure 4-22) in the lifting rings. Lift the Generator Set 150 kW with the
crane, and position it above the pallet frame so the Generator Set 150 kW is centered over
recesses (5).
CAUTION
Before lowering Check the alignment of the Generator Set 150 kW. The
openings of the exhaust pipes (4) must be visible and not on the same side
as the cable drums.
e. Lower the Generator Set 150 kW into the recesses (5) in the pallet frame.
f.
Swing the cable drum into the operating position and lock in place.
g. Attach the four mounts to the Generator Set 150 kW:
(1) Remove nut (6).
(2) Unscrew nut (7) to end of threads.
(3) Coat threads of bolt (9) with copper paste.
(4) Swing plate (8) with bolt (9) so the bolt rests in fork (11, figure 4-21).
(5) Tighten nut (7, figure 4-22) to a torque value of 88.42 ft-lb (120 Nm).
(6) Tighten nut (6) to a torque value of 132.66 ft-lb (180 Nm).
h. Attach grounding cable:
(1) Place grounding cable (9, figure 4-21), washer (8) and serrated washer (7), onto
grounding bolt (13).
(2) Tighten nut (6) to a torque value of 18.42 R-lb (26 Nm).
(3) Apply terminal grease to threaded connection.
i.
Remove sling assembly (2, Figure 4-22), and attach to pallet frame.
4-53