TM 9-6115-669-13&P
e.
Remove nut (14) and spring (16) from screw (15).
f.
Install a new spring (16) on screw (16) and install nut (14).
g.
Install parts (14, 15, 16) on mount and secure with nut (13). Tighten nut (13).
h.
Remove wooden wedge and loosen cable drum (1) until ratchet locks in place.
a.
Install cable drum bracket (11) with screw (9), washer (8, 10), serrated lock washer (7), and
nut (6). Tighten nut (6).
b.
Place cable drum (1) on carrier (5) so the four holes align and the locking lever is not in
contact with the ratchet mechanism on the cable drums.
c.
Attach cable drum with four screws (2), serrated lock washers (3) and washers (4).
d.
Tension cable drum by rotating it through 15 revolutions, and engage the cable drum
locking.
e.
Install power cable as instructed in paragraph 4.13.
4-31