TM 9-6115-669-13&P
To repair power cable refer to paragraph 5.8.
N O T E
The EPP III plug end can be identified by a piece of heatshrink tubing
18.04 ft. (5500 mm) before the plug. The plug also has pins (male).
a.
Grasp cable at EPP III plug end (4), and insert into the cable drum through slot (9).
b.
Position the cable at the point with the piece of heatshrink tubing above the clamp (8).
Secure cable with clamp (8) and two nuts (6, 7), tighten the first nut (7) and lock with the
second nut (6).
c.
Connect load bank to generator set and perform procedures in paragraph 4.34.
N O T E
When stowing the cable, cover the plugs with their protective green
socks and secure them with the strap.
d.
Wind cable on by hand and secure with mounts (5).
e.
Proceeding slowly, wind cable completely on at RS/ECS end (2) by hand.
4-34
Change 1