TM 9-6115-669-13&P
4.5 UNPACKING EQUIPMENT FROM THE CONTAINER USING A CRANE.
4.5.1 Unpacking Pallet Frame.
a.
Remove cover and four sides of the container (figure 4-1).
b.
Detach film so that lifting lug (15, figure 4-3) at center and the two lifting lugs (16) on the
pallet frame are accessible from the side.
c.
Detach film from the end of the pallet frame so the sling assembly (6) is accessible.
d.
Remove sling assembly (6) from the pallet frame. Suspend the sling assembly from the crane.
e.
Position the crane approximately centered above the three lifting lugs (15, 16) of the pallet
frame.
Do not stand in the operating area of the crane. Do not walk
under the suspended load.
Move the pallet frame slowly so that it remains in the
horizontal position.
f.
Insert the three cable hooks of the sling assembly into the three lifting lugs (15,16). Lift up
the pallet frame and lower it onto a solid surface.
g.
Detach the sling assembly and mount it on the pallet frame.
4.5.2 Unpacking Generator Set 150 kW.
a.
Remove cover and four sides of the container (figure 4-1).
b.
Detach film so the four lifting rings (17) at the corners are accessible.
c.
Remove sling assembly (6) from the pallet frame. Suspend the sling assembly from the crane
and position the crane approximately above the center of Generator Set 150 kW as shown in
figure 4-3.
Do not stand in the operating area of the crane. Do not walk
under the suspended load.
Move the Generator Set 150 kW slowly so that it remains in
the horizontal position.
d.
Insert the four cable hooks of the sling assembly into the lifting rings (17). Lift up the
Generator Set 150 kW with the crane and lower it onto a solid surface.
e.
Detach the sling assembly from the Generator Set 150 kW and mount it on the pallet frame.
4 - 9
