TM 9-6115-669-13&P
4.4.4 Unpacking Equipment.
Unpack the Generator Sets 150 kW and pallet frame as indicated in figure 4-2.
a.
Remove coyer (1) and wooden members (2).
b.
Remove one wide side.
c.
Detach film at points (3). The forklift sockets (18, 19, figure 4-3) are located here.
CAUTION
To ensure correct lifting of the pallet frame, use the forklift only on
the side where the cable drums are located (load imbalance hazard).
NOTE
The Generator Set 150 kW is secured to the bottom of the container
with square wooden members only (no threaded fasteners), and can
be lifted up.
Separate the Generator Set 150 kW from the container using a
forklift or crane. If using a crane, see paragraph 4.5.
d.
Insert forks, lift Generator Set 150 kW with packaging, and lower onto a solid surface.
e.
Remove all film material from the Generator Set 150 kW. Check pallet frame against figure
4-3 for completeness.
f.
The following parts must be installed on the pallet frame:
4 Exhaust pipes (1) in container
1 Fire extinguisher (2)
1 Fire extinguisher (3)
2 Grounding cables (4), one cable unattached
1 Grounding rod (5)
1 Sling assembly (6) with two attachment belts
3 Grounding straps (7) bolted onto frame
8 Bolt connections (8)
g.
The following items (four of each) are also included in the packaging
Threaded bolts (9)
Serrated lock washers (10)
Washers (11)
Tightening assembly (12)
Threaded bushings (13)
Bolts with spring pins (14)
Once unpacked, the EPP III is ready to operate.
h.
Prepare the Generator Set 150 kW for start up as instructed in TM9-6115-668-13:
i.
Fill the unit fuel tank, and attach cable to battery (-) terminal.
4-6