Remove nut (1, FIGURE 3-13), Iockwashers (2), and bolt (3) securing ground strap (4) to skid base.
Remove bolts (5), washers (7), and Iockwashers (6) securing load output terminal board assembly (8) to sup-
ports (9) and (10). Pull load output terminal board assembly out through access door.
Remove assembled nuts (11), bolts (12), and support (10) from right side panel.
au.
av.
aw.
ax.
ay.
az.
3-18
4
FIGURE 3-13. Load Output Terminal Board
Loosen nuts (45, FIGURE 3-14), turn bolts (46) to contact skid base and tighten nuts (45).
Remove nuts (6), Iockwashers (7), screws (8), washers (9), and screen/cover (10) from generator case.
Scribe mark on generator drive disc and engine flywheel for alignment of bolts during installation.
Remove bolts (11) and washers (12) securing generator drive disc to engine flywheel.
WARNING
Rated capacity of overhead hoist should be at least 1,500 Ibs (580 kg). Using a hoist
with less capacity could result in equipment damage, personal injury, or death.
Attach lifting harness to engine and overhead hoist. Take up slack.
Remove bolts (13), Iockwashers (14), and washers (15) securing generator to flywheel housing adapter (44).