ARMY TM 9-6115-645-24
AIR FORCE TO 35C2-3-444-12
MARINE CORPS TM 09244A/09245A-24/2
f
Install fuse (1) in fuse holder (2).
g
Secure excess wire to wiring harness using tie wrap.
h
Install malfunction indicator panel (27, FIGURE 2-14), screws (24), washers (25), and nuts (26).
i
Reconnect negative battery cable and close battery access door.
NOTE
When replacing GROUND FAULT CIRCUIT INTERRUPTER, use new GROUND FAULT CIRCUIT
INTERRUPTER with integral circuit breaker. Refer to TM 9-6115-644-24P for new part number.
FIGURE 2-14.1. In-Line Fuse Installation
2-47.4
Installation.
a
Install GROUND FAULT CIRCUIT INTERRUPTER (23, FIGURE 2-14) in malfunction indicator panel with screws
(21) and nuts (22).
b
Connect electrical leads to TBD and K5, convenience receptacle (20) and remove tags.
c
Install control box top panel, paragraph 2-15.4.
d
Connect negative battery cable
Close battery access door.
2-48
MALFUNCTION INDICATOR PANEL.
2-48.1
Inspection.
a. Shut down generator set.
b. Inspect malfunction indicator panel for broken indicator lights, cracked housing, corrosion, and other damage.
2-48.2
Testing.
a. Depress TEST/RESET button and check that all indicators are lit.
b
Replace malfunction indicator panel if one or more indicators do not light.
Change 4 2-78.11(2-78.2 blank)