With any access door open, the noise level of
this generator set when operating could cause
hearing damage. Hearing protection must be
worn when working near the generator set
while running.
m. Perform all DURING (D) OPERATION PMCS re-
quirements in accordance with Table 2-3.
2-9.2 Stopping Procedure.
a.
b.
c.
d.
e.
2-10
Place AC CIRCUIT INTERRUPTER switch in
OPEN position.
Allow generator set to operate five minutes with no
load applied.
Place MASTER SWITCH in OFF position.
Perform all AFTER (A) OPERATION PMCS re-
quirements in accordance with Table 2-3.
Place DEAD CRANK switch in OFF position.
PARALLEL UNIT OPERATION (LOAD
S H A R I NG
ARMY TM 9-6115-644-10
AIR FORCE TO 35C2-3-446-11
MARINE CORPS TM 09249A/09246A-10/1
Ensure generator sets are the same size and mode
before attempting parallel operation.
2-10.1 General. The following method of parallel op-
eration will be used to share the load between two genera-
tor sets. Refer to Figure 2-1 for location of operator
controls and indicators mentioned below and Figure 2-5
for proper paralleling configuration.
2-10.2 Pre-Operation.
a.
Prior to making any connections for parallel opera-
tion, ensure that there is no input to the load and
that the generator sets are shut down. Failure to ob-
serve this warning can result in injury or death by
electrocution.
Ensure that load requirement is equal or below the
combined rated capacity of the two generator sets.
Change 1 2-23