TM5-6115-640-14&P
Replacement procedures are the same for both power plants. Shown is the switch box for AN/MJQ-33.
a.
Removal.
(1)
Remove switch box (paragraph 4-19c(1)).
(2)
Remove six locknuts (9, figure 4-20) (if AN/MJQ-33) or four locknuts (if AN/MJQ-32), flat washers (10), and
screws (11) securing bracket (d) to roadside fender (if AN/MJQ-33), or roadside rear fender extension (if
AN/MJQ-32).
(3)
Remove bracket from fender or fender extension.
(4)
Remove wingnut (1), washer (2), ground wire (3), washer (4), nut (5), and star washer (6) securing ground stud
(7) to bracket (8).
b.
Installation.
(1)
Position bracket (8) on fender or fender extension.
(2)
Insert six screws (if AN/MJQ-33) or four screws (if AN/MJQ-32) (11) through bracket (8) and roadside fender, or
roadside rear fender extension.
(3)
Install flat washer (10) and locknut (9) on each screw (11).
Tighten hardware to secure bracket.
(4)
Insert ground stud (7) into bracket (8) frame and install star washer (6), nut (5) (tighten), washer (4), ground wire
(3), washer (2), and wingnut (1). Tighten wingnut.
(5)
Install switch box (paragraph 4-19c(2)).
4-38. POWER CABLE BRACKET REPLACEMENT.
This task covers:
1. Removal
2. Installation
Initial Setup:
1.
Tools - General Mechanics Tool Kit (5180-00-177-7033)
2.
Materials/Parts - Power Cable Bracket (97403); 1312E3612
The power cable brackets are used to route the power cabling between the generator sets and the switch box for both
power plants. They are situated at various locations along the cable path and are common to both power plants.
4-60