TM 5-6115-631-14&P
(b) Unfasten six straps and buckles (3) securing rear curtain (4). Roll up curtain, and secure
with three rollup straps (5) provided.
(c) Unfasten six straps and buckles (3) securing front curtain (6). Roll up curtain, and secure
with three rollup straps (5) provided.
(d) Roll up each side (7) of fitted cover, in turn, and secure each side with six rollup straps
(5) provided.
(e) Working under fitted cover (1, figure 3-2), unfasten 12 straps (2) securing fitted cover to
bow assemblies (3). Remove fitted cover.
(2) Installation.
NOTE
Front curtain is provided with three tie-down ropes. Rear curtain only has two ropes.
(a)
(b)
(c)
(d)
(e)
(f)
Position fitted cover (1, figure 3-2) on top of bows (3) making certain front of fitted cover
is at front of trailer.
Secure fitted cover (1) to bow assembly (3) with 12 straps (2) provided.
Unfasten rollup straps (5, figure 3-1) securing sides of fitted cover and lower both sides (7).
Unfasten rollup straps (5) securing front and rear curtains (4, 6) and lower both curtains.
Secure front and rear curtains (4, 6) to sides (7) with six straps and buckles (3) provided
on each curtain.
Secure fitted cover to trailer body (2) with 25 ropes ( 1 ) provided,
Figure 3-1.
Fitted Cover Installed on Power Plant.
Change 1
3-20