TM 5-6115-630-14&P
Item
no.
1
2
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (cont).
B Before
D During
A After
W - Weekly
M Monthly
l
l
Interval
Item to be inspected.
Procedure: check for and have repaired,
filled, or adjusted as needed
NOTE
Perform weekly as well as before PMCS if
you are operating the equipment for the first
time.
GENERATOR SET EXTERIOR
a. Check on, around, and beneath the generator
set (1) for fuel or oil leaks.
b. Check that generator set (1) grounds are
properly installed and grounding
connections are tight.
FUEL GAGE
Check fuel gage (2) for sufficient fuel for
continuous operation.
Equipment is not
ready/available if:
A Class Ill lubrication oil or
any class fuel leak is
detected.
Not properly grounded.
3-5