TM 5-6115-627-14&P
(1)
(2)
(3)
Position each mounting bracket (5) on trailer frame (10). Insert three screws (7) through frame into each
bracket. Install one washer (8) and one self-locking nut (9) on each screw and tighten.
Holding platform (4) in vertical position, position platform on mounting brackets (5) so that holes in
platform line up with holes in brackets and install platform anchors (6) in upper mounting hole on each
side of platform.
Secure platform (4) to brackets (5) with two screws (1), four flat washers (2) and two nuts (3).
Personnel Platform Replacement.
(See figure 4-12.) Three holddown straps are provided on the
Figure 4-11.
4-25. Holddown Strap Replacement.
roadside fender of each power unit. These straps are used to secure the power cables when the power plant is in
transit. Replacement procedure is typical.
a. Removal.
(1)
Remove two screws (1, figure 4-12), two washers (2), and two nuts (3) securing strap fastener loop (4)
to trailer (5).
Slide holddown strap (6) off strap fastener loop (4).
(2)
b.
Installation.
(1) Slide holddown strap (6) onto strap fastener loop (4).
4-26