TM 5-6115-627-14&P
j.
g.
h.
i.
k.
l.
m.
n.
o.
Close switch box access door and cap connectors. Position switch box on curbside fender of power unit B
and secure with hardware provided.
Stow any remaining authorized equipment in accessory box.
Secure fire extinguishers and fuel cans in their respective mounting brackets.
Close all doors on the generator set enclosures.
On each power unit, swing personnel platform up into traveling position and secure with two platform anchor
quick-release pins.
WARNING
Use care when releasing spring-loaded lower tube of leveling jacks. The lower tube will
return to retracted position with considerable force and can cause injury.
Retract lower tubes of leveling jacks. Swing leveling jacks up into traveling position and secure with
Iockpins.
Remove wheel chocks.
Attach power units to towing vehicles. Refer to TM 9-2330-205-14&P.
Release trailer handbrakes on both power units.
4-4. Reinstallation After Movement. After movement to a new worksite, install power plant in
accordance with paragraph 4-2.
Section III. REPAIR PARTS, SPECIAL TOOLS, SPECIAL TEST, MEASUREMENT
AND DIAGNOSTIC EQUIPMENT (TMDE)
4-5. TOOIS and Equipment. There are no special tools or equipment required to maintain the AN/MJQ-10A .
power plant.
4-6. Maintenance Repair Parts. Repair parts and equipment for maintenance of this power plant are listed
and illustrated in the repair parts and special tools list in Appendix D of this manual.
Section IV. LUBRICATION INSTRUCTIONS
4-7. General. Detailed instructions for the lubrication of the major components of the power plant are contained
in the applicable Lubrication Orders (LOs). Refer to DA Pam 25-30 to ensure that the latest editions of the L.O.S
are used. This section contains lubrication instructions that are not included in the Lubrication Orders.
4-8. Generator Lubrication. Refer to TM 5-6115-465-12 for generator set Lubrication Order.
4-8