5. SWITCH BOX OUTPUT TERMINALS SHOULD NOW HAVE POWER (REF TB1).
D. TO OPERATE TWO UNITS IN PARALLEL, THIS PROCEDURE SHOULD BE FOLLOWED:
1.
2.
3.
4.
5.
6.
E. TO
1.
2.
CONNECT ALL NECESSARY CABLES TO GENERATORS AND SWITCH BOX ASSEMBLY.
BRING FIRST GENERATOR INTO OPERATION ACCORDING TO THE PROCEDURE
OUTLINED IN INSTRUCTIONS B AND C.
BRING SECOND GENERATOR UP TO RATED SPEED, VOLTAGE AND FREQUENCY.
CLOSE CIRCUIT BREAKER ON SECOND GENERATOR.
MOVE SWITCH BOX SWITCH, CORRESPONDING TO THE SECOND GENERATOR, TO
ON POSITION.
THE PARALLELING OPERATING SHOULD BE COMPLETE.
STOP OPERATION OF UNIT(S), THIS PROCEDURE SHOULD BE FOLLOWED:
MOVE SWITCH BOX SWITCH, CORRESPONDING TO THE APPLICABLE GENERATOR(S)
STOPPED, TO OFF POSITION.
OPEN CIRCUIT BREAKERS ON GENERATOR(S) TO BE STOPPED.
(7) Instruction plate.
(a) Location. This plate is located on the outside of load terminal access door.
(b) Content.
DANGER
HIGH VOLTAGE
(8) Identification plate.
(a) Location. This plate is located on the connector side of switch box above ground stud E1.
(b) Content.
GROUND TERMINAL
(9) Instruction plate.
(a) Location. This plate is located on connector side of switch box above connectors J3 and J4 (parallel
cable inputs).
1-6