TM 3-1040-280-20&PSection IV. M284 MAINTENANCE PROCEDURES2-8.INTRODUCTION . This section contains maintenance procedures which are the responsibility of the unitmaintenance technician as authorized by the maintenance allocation chart (MAC) (app B) and source, maintenance, andrecoverability (SMR) coded items in the repair parts and special tools list (RPSTL).2-9.M284 MOUNTING KIT.This task covers painting and replacement of:a.Generator Bracket Assembliesb.Frame Assemblyc.Compressor Mounting Plated.Fuel Can Bracket Assemblye.Fuel Can Base Platef.Fire Extinguisherg.Control Panel Mounting Bracketh.Fuel Lid Assemblyi.Cable Assembly W1 (Power)j.Air Hose Assembliesk.Oil Hose AssembliesPAINTINGINITIAL SETUPMaterials/Parts ReferencesAbrasive cloth (item 3, app D) TM 43-0139Dry cleaning solvent (item 4, app D)Polyurethane coating (item 7, app D)Primer coating (item 5, app D)Rag (item 8, app D)Paint brush (item 2, app D)a.Remove corrosion and chipped paint.WARNINGDry cleaning solvent is flammable and toxic. Keep it away from heat oropen flames. Use in well ventilated area. Avoid breathing vapors.Failure to observe precautions may result in injury to personnel ordamage to equipment.b.Clean surface to be painted using rags and dry cleaning solvent.c.Paint surface with primer coating and polyurethane coating. See TM 43-0139.2-20
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business