TM5-6115-640-14&P
4-42. TAILLIGHT CABLE ASSEMBLY AND ELECTRICAL LEAD MAINTENANCE.
This task covers:
1. Test
3. Repair
2. Removal
4. Installation
Initial Setup:
1.
Tools - General Mechanics Tool Kit (5180-00-177-7033)
- Multimeter AN/PSM-45 (6625-01-139-2512)
2.
Materials/Parts - Connectors, Male (96906); MS27142-2
- Connectors, Female (96906); MS27142-1
- Tape, Electrical
The taillight cable assembly and electrical leads have been modified (lengthened) to compensate for the repositioning of
the right and left rear stop lights. Therefore, for the tasks covering testing, removal, repair, and installation, refer to TM9-
2330-202-14&P.
Section XVIII. PREPARATION FOR SHIPMENT AND STORAGE
4-43. PREPARATION FOR SHIPMENT.
The power plants AN/MJQ-32 and AN/MJQ-33 can be shipped by rail, air, or sea without damage to the units. The power
plants will be packaged for shipment in accordance with MIL-G-28554B, Level A, B, or Commercial packing instructions.
4-44. PREPARATION FOR STORAGE
a.
Placement of equipment in administrative storage should be for short periods of time when a storage of
maintenance effort exists. Items should be in mission readiness within 24 hours or within the time factors as determined
by the directing authority. During the storage period, appropriate maintenance records will be kept.
b.
Before placing equipment in administrative storage, current maintenance services and equipment serviceable
criteria (ESC) evaluations should be completed; shortcomings and deficiencies should be corrected, and all modification
word orders (MWO's) should be applied.
c.
Storage site selection. Inside storage is preferred for items selected for administrative storage.
If inside storage
is not available, trucks, vans, conex containers and other containers may be used.
4-66
