TM 9-6115-730-24
HOW TO USE THIS MANUAL - Continued
DIRECT SUPPORT (FIELD) LEVEL MAINTENANCE WORK PACKAGES
Chapter 5 Direct Support (Field)
Level Maintenance
Instructions contains Direct Support (Field) Level
Maintenance Instructions work packages for the Generator Set.
Read the INITIAL SETUP section of each maintenance work package carefully before you start any maintenance
procedure. Get the tools and supplies listed and the personnel needed.
Chapter 6 General
Support Level Maintenance
Instructions. These instructions have been moved to
Sustainment
(NMWR) in accordance with Implementation of Two Level Maintenance.
Chapter 7 contains Supporting Information, including References WP, Introduction and Two-Level MAC work
packages, Expendable and Durable Items List WP, Tool Identification List WP, Mandatory Replacement Parts WP,
and any additional support items WPs.
Rear Matter. At the rear of your manual, you will find a Glossary, Alphabetical Index, Foldout schematics, DA Form
2028s.
While performing the procedures in this manual, you may find that you are able to make suggestions that will improve
the manual. At the back of this manual, you will find copies of DA Form 2028 that invite you to submit your
suggestions.
DIRECT SUPPORT (FIELD) LEVEL MAINTENANCE
TACTICAL QUIET GENERATOR 200 kW, 50/60 Hz MEP-809A/PU-809A
TITLE
CRANKSHAFT VIBRATION DAMPER AND PULLEY MAINTENANCE
TOOLS AND
INITIAL SETUP:
SPECIAL TOOLS
Tools and Special Tools
Personnel Required
PERSONNEL
Tool Kit, General Mechanic's
One
REQUIRED
(WP 0123, Item 5)
References
REFERENCES
Materials/Parts
TM 9-6115-730-10
MATERIALS/
Marker tag
PARTS
(WP 0124, Item 6)
Equipment Condition
EQUIPMENT
Drive belt removed (WP 0068)
CONDITION
LEGEND:
TITLE
The name of the procedure.
TOOLS AND SPECIAL TOOLS
The tools and equipment needed to do the procedures.
MATERIALS/PARTS
The supplies and parts needed to do the procedures.
PERSONNEL REQUIRED
The personnel needed to do the procedures.
REFERENCES
Other work packages, manuals, and publications needed to do the procedure.
EQUIPMENT CONDITION
Special equipment condition(s) or procedures to be performed before starting the
procedure.
xii