1. Cut each wire (11) and (12) to length indicated,
1. Dimensions are shown in inches and
then strip 0.50 [13] from ends of each wire.
dimensions in [ ] are in millimeters.
2. Insert wires (11) and (12) into each pin from
connector (1) and crimp using crimping tool.
for materials required.
3. Slide .75 to 1.25 [19.1 to 31.8] of insulation
3. Connector shall be marked "J2" on insulation
sleeving (14) with 0.18 [5] minimum high
sleeving (10) over wire (12) and insulation
characters IAW MIL-STD-130 using rubber
sleeving (13) over wire (11).
stamp or stencil.
4. Using a pin insertion tool, insert pins from
connector (1) into connector (1) until pins
lock into place, following termination
indicators in wire list reference table.
5. Slide insulation sleeving (10) and (13) to
connector (1), and heat shrink to a firm fit.
6. Slide insulation sleeving (14) over wire bundle
to connector (1), and heat shrink to a firm fit.
7. Slide insulation sleeving (10) over each of the
wire reference numbers 3, 4 and .5
8. Slide terminal lug (7) onto wire reference
numbers 3, 4 and 5 and crimp. Slide insulation
sleeving (10) over terminal lugs (7) and heat
shrink to a firm fit.
9. Slide terminal lugs (5), (6) and (8) onto wire
reference numbers 1, 2 and 6 and crimp.
10. Mark the appropriate wire number which will
consist of the `FROM' termination, a double-
headed arrow (↔), and the `TO' termination.