ARMY TM 9-6115-670-14&P
4-122
a. Tag and disconnect connectors J4 (12, Figure 4-36), J5 (10), and J6 (9).
b. Tag and remove electrical leads (6 and 7) between governor control assembly and
actuator/solenoid.
c. Remove four screws (17) (bolts, SICPS), and remove generator housing top cover (18).
d. Inside generator top, remove nut with captive washer (1), two ground leads (2), one more nut with
captive washer (1), and two more ground leads (2) from bolt (5).
e. Remove ground leads (2).
f. Outside generator top, remove bolt (5) and lock washer (3) securing governor control assembly
ground wire (4). Remove ground wire (4).
g. Remove three remaining bolts and nuts with captive washers (14) securing governor control
assembly (16) to generator back panel (15) and remove governor control assembly (16).
h. Install new governor control assembly (16) to generator back panel (15) and secure with three bolts
and nuts with captive washers (14) in upper left, bottom left, and bottom right mounting holes.
i. Install governor control ground wire (4) to upper right mounting hole, and secure with remaining bolt
(5) and nut with captive washer (3).
j. Inside generator top, install two ground wires (2) to bolt (5), nut with captive washer (1), two more
ground wires (2), and one more nut with captive washer (1).
k. Re-connect electrical leads (6 and 7) between governor control assembly (16) and
actuator/solenoid.
l. Re-connect connectors J4 (12), J5 (10), and J6 (9).
m. Install cover to generator housing top cover (18) and secure with four screws (17) bolts.
CAUTION
Note position of items (1) and (2) during disassembly to
ensure proper reassembly.
NOTE
Bolt on governor control unit securing the governor
control unit ground wire also secures ground wires inside
the generator top that must be removed prior to removing
governor control unit.