TM 9-6115-669-13&P
a.
Stow prop (2), close access door (1), and secure.
b.
Position crane with sling in front of power distribution unit so that sling can be attached
beside shock absorbers (2, figure 4-30).
WARNING
Do not stand in the operating area of the crane. Do not walk
under the suspended load.
The lifting height of the crane must be sufficient to lift the
power distribution unit easily off the base frame.
Move the power distribution unit slowly so it remains
horizontal.
CAUTION
Be careful not to damage the cables.
c.
Using the crane, position power distribution unit (1) approximately 8 inches (20 cm) above
pallet frame (18) so that screws (3) align with their holes in the pallet frame.
d.
Gather the power distribution unit cables to the front.
e.
Lay out the cables as shown in figure 4-33. On the left side of the power distribution unit,
cables N, L1, and the control cable must lie against pallet frame (1) betweenthe two holes (2).
The other cables pass beneath the cable drum mounts (3), as shown in front of and behind the
mount.
Figure 4-33 Power Distribution Unit, Cable Installation Position.
4-72