TM 9-6115-669-13&P
To repair control cable refer to appendix G.
N O T E
The EPP III plug end (with pins) is identified by a piece of heatshrink
tubing located 220.8 inches (5600 mm) before the plug.
a.
Grasp cable at the EPP III plug end (3) and pass it through slot (8) into the cable drum.
b.
Position the cable at the point with the piece of heatshrink tubing above clamp (7). Secure
cable with clamp (7) using two nuts (5, 6), tighten the first nut (6) and lock it with the second
nut (5).
c.
Connect load bank to generator set and perform procedures in paragraph 4.34.
N O T E
When stowing the cable, cover the plugs with their appropriate
protective green socks and secure them with the strap.
d.
Wind the cable on by hand and secure with the strap clip (4).
e.
At the RS/ECS plug end (1), slowly wind cable completely on by hand.
4-40
Change 1