TM 9-6115-653-14&P
CHAPTER 4
UNIT MANTENANCE
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
4-1 Inspecting and Servicing Equipment. The power unit is unpacked, inspected, and serviced as described in the
following paragraphs. Unpacked equipment must be checked against the Equipment Packing List to insure
completeness. Discrepancies must be reported in accordance with instructions In DA Pam 738-750
a.
Unpacking Power Unit (See figures 4-1 and 4-2 ) The generator set is packed in place on the trailer frame
Before beginning the unpacking procedure, locate, remove, and save the waterproof envelopes marked Depreservatlon
Guide
4885-025
Figure 4-1. Power Unit Packed for Shipment.
4-1