b. Bow Assembly Replacement. (See figure 3-3.)
(1) Removal.
(a) Remove fitted cover (paragraph 3-11, a.(1)).
(b) Remove two quick release pins (1) securing each bow assembly (2) in pockets (3) on trailer body (4).
Lift each bow out of pocket and off trailer body.
Figure 3-3. Bow Assembly Replacement.
(2) Installation.
(a) Lift each bow (2) onto trailer, aline ends with pockets (3) in trailer body (4) and drop bow in place.
Secure each bow assembly with two quick release pins (1) provided.
(b) Install fitted cover on trailer (paragraph 3-11, a.(2)).
3-12. Fire Extinguisher Maintenance. The AN/MJQ-25 Power Plant is equipped with two 5 lb CO2 fire
extinguishers. Maintenance is limited to weighing the fire extinguishers monthly to insure that they are sufficiently
charged. Fully charged, each fire extinguisher weighs 15.5 lbs. Send the unit to specialized activity for recharging
if it weights 15.0 lb or less.
CAUTION
Do not attempt to verify readiness of a fire extinguisher by partially discharging unit. Any
discharge of contents will require refilling.
3-20