ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
4.16.2 Installation.
a .
b .
c.
d.
e.
f .
g.
h.
j. Lift generator slowly from skid base, ensuring that engine flywheel housing and generator separate smoothly
avoiding any undue stress.
k. Remove shock mounts (13) from skid base.
l. Remove nuts (14), washers (15), bolts (16), angles (17), and plates (18) from generator.
Position generator shock mounts (13, FIGURE 4-8) in skid base.
Install angles (17) and plates (18) on generator with bolts (16), washers (15), and nuts (14).
CAUTION
Rated capacity of overhead hoist should be at least 1,000 Ibs (454 kg),
Attach lifting harness to overhead hoist and generator Iifting eye.
Position generator on skid base aligning mounting holes with mounts and engine flywheel housing.
Install bolts (4) and Iockwashers (5) securing generator drive disc to engine flywheel. Torque bolts (4) to 35 ft-lbs
(47 Nm).
Install bolts (6) and Iockwashers (7) securing generator to flywheel housing. Tighten bolts (6) slowly to ensure prop-
er seating of generator case lip in engine flywheel housing. Torque bolts (6) to 31 ft-lbs (42 Nm).
Install bolts (11), Belleville washers (12), snubbing washers (10), washers (9), and nuts (8) securing generator
assembly to skid base. Torque bolts (11) to 210 ft-lbs (285 Nm).
Install screen/cover (3) on generator case with screw (1), and washer (2).
4-30