ARMY TM 9-6115-643-24
AIR FORCE TO 35C2-3-445-22
2.52.4. Installation.
a. Install kilowatt transducer (40, FIGURE 2-14) with screws (39).
b. Connect electrical leads and remove tags.
c. Install control box top panel, paragraph 2.15.4.
d. Connect negative battery cable. Close battery access door.
2.53. SHUNT.
2.53.1.
Inspection.
a. Shut down generator set.
b. Inspect shunt for cracked casing, burned or broken terminals, and other damage.
2.53.2. Testing.
a.
b.
c.
d.
e.
f.
g.
Shut down generator set.
Remove control box top panel, paragraph 2.15.1.
Tag and disconnect shunt (43, FIGURE 214) electrical leads.
Set multimeter for ohms and connect to shunt terminals 1 and 4. Muitimeter should indicate less than 0.5 ohms.
Replace shunt if multimeter indication is greater than above.
If no repair is needed, connect electrical leads to shunt (43) and remove tags.
Install control box top panel, paragraph 2.15.4.
2.53.3.
Removal.
a.
b.
c.
d.
e.
f.
Shut down generator set.
Open battery access door and disconnect negative battery cable.
Remove control box top panel, paragraph 2.15.1.
Remove control box assembly, paragraph 2.19.2.
Tag and disconnect shunt (43, FIGURE 2-14) electrical leads.
Open output box access door and remove screws (41), nuts (42), and shunt (43).
2.53.4.
Installation.
a.
b.
c.
d.
e.
f.
Install shunt (43, FIGURE 2-14) and secure with screws (41) and nuts (42).
Close output box access door.
Connect all electrical leads and remove tags.
Install control box assembly, paragraph 2.19.4.
Install control box top panel, paragraph 2.15.4.
Connect negative battery cable. Close battery access door.
2-85