TM 5-6115-640-14&P
Table 4-1. Unit Preventive Maintenance Checks and Services - Continued
H - Hours of operation
W - Weekly
M - Monthly
S - Semiannually
(As indicated)
(40 hours)
(100 hours)
(500 hours)
INTERVAL
ITEM
Item to be inspected
Procedures
NO.
H
W
M
S
20
Brakes
Adjust brake. (Refer to
TM 9-2330-202-14&P).
21
Wheel Bearings
Clean and repack. (Refer
to TM 9-2330-202-14&P).
22
Hydraulic Brake Tubes and
Inspect for dents, cracks,
Hoses
loose connections, and
leaks. Repair or replace
as necessary.
23
Trailer - Road Test
Perform road test, paying
special attention to items
that were repaired or ad-
justed.
Section V. TROUBLESHOOTING
4-13. TROUBLESHOOTING.
Troubleshooting procedures for components unique to each power plant's end item are given in paragraph 4-14.
Troubleshooting information for the individual generator sets and trailer is contained in their respective technical manuals
referenced below.
a.
Generator Set Troubleshooting. Refer to TM5-6115-615-12 for troubleshooting procedures applicable to the
generator set.
b.
Trailer Troubleshooting. Refer to TM9-2330-202-14&P for troubleshooting procedures applicable to the trailer.
4-17