TM 5-6115-640-14&P
Section II. OPERATION UNDER UNUSUAL CONDITIONS
2-2. OPERATION UNDER UNUSUAL CONDITIONS.
When operating the power plant under unusual conditions such as extremes in temperature or difficult terrain, there are
steps that must be taken to protect the equipment.
a.
Refer to TM5-6115-615-12 for specific procedures when operating the ASK generator sets under unusual
conditions.
b.
Refer to TM9-2330-202-14&P for specific procedures when operating the trailers under unusual conditions.
Section III. OPERATION OF AUXILIARY EQUIPMENT
2-3. OPERATION OF AUXILIARY EQUIPMENT.
There is no auxiliary equipment supplied with the power plants.
Section IV. PREVENTIVE MAINTENANCE CHECKS AND SERVICES
2-4. GENERAL.
The operator/crew preventive maintenance checks and services (PMCS) listed in table 2-1 are grouped according to
stages of equipment operation or time intervals. Using the following as a guide, do the checks and services at the
intervals shown. All PMCS pertain to both the AN/MJQ-32 and AN/NJQ-33 unless otherwise noted.
Before you operate, perform your before (B) PMCS. Observe all CAUTIONS and WARNINGS.
While you operate, perform your during (D) PMCS. Observe all CAUTIONS and WARNINGS.
After you operate, be sure to perform your after (A) PMCS.
Do (W) PMCS weekly.
Do (M) PMCS monthly.
If equipment fails to operate, refer to Section IV Troubleshooting. If the problem cannot be corrected, refer to DA
Pam 738-750.
2-4