TM 5-6115-632-14&P
Table 3-2. Operator/Crew Preventive Maintenance Checks and Services (PMCS) CONT.
B Before
D During
A After
W Weekly
M Monthly
Item
no.
20
Interval
Item to be inspected.
Procedure: check for and
have repaired, filled, or
adjusted as needed
GENERATOR SET GAGES AND
INSTRUMENTS CONT
d. Check that voltmeter (22) indicates
desired output voltage as deter-
mined by load connections and amps-
volts switch.
e. Check engine oil pressure gage (23)
for 25 psig indication.
Equipment is not
ready/avaiIable if:
Desired voltage can-
not be obtained and
maintained.
Oil pressure drops
below 15 psig.
3-13