OPERATOR/CREW
CHAPTER 3
MAINTENANCE
ARMY TM 5-6115-625-14&P
INSTRUCTIONS
Section I. CONSUMABLE OPERATING AND MAINTENANCE SUPPLIES
3-1. Consumable Supplies. Consumable supplies used in the maintenance and operation of the
power unit are listed in Table 3-1.
Table 3-1. Consumable Operating and Maintenance Supplies.
(1)
C o m p o n e nt
a p p l i c a t i on
G e n e r al
C l e a n i n g
Personnel
P l a t f o rm
(2)
N a t i o n al
s t o c k
n u m b e r
6850-00-664-5685
9150-00-186-6681
9150-00-402-4478
(3)
D e s c r i p t i o n
Solvent, Drycleaning,
P-D-680
Oil, Lubricating,
OE/HDO-30 WT
Oil, Lubricating, OEA
(4)
Q ty
r e q u i r ed
for initial
o p e r a t i on
1 quart
1 quart
1 quart
(5)
Q t y
r e q u i r e d
8 hours
o p e r a t i on
As required
As required
As required
(6)
N o t es
Section Il. LUBRICATION INSTRUCTIONS
3-2. General. Detailed instructions for the lubrication of the major components of the power unit are
contained in the applicable Lubrication Orders (LOs). Refer to DA Pam 310-1 to ensure the latest
editions of the LOs are used.
3-3. Generator Lubrication. Refer to TM 5-6115-464-12 for generator set Lubrication Order.
3-4. Trailer Lubrication. There are no operator/crew lubrication requirements for the power unit
trailer.
Section Ill. PREVENTIVE MAINTENANCE
N O TE
CHECKS AND SERVICES (PMCS)
The PMCS chart in this section contains all necessary Operator/Crew
preventive maintenance checks and services for this equipment.
3-5. General. The preventive maintenance checks and services listed in Table 3-2 are grouped
according to stages of equipment operation or time intervals. Using the following as a guide, do the
checks and services at the intervals shown.
a. Before you operate, perform your before (B) PMCS. Observe all CAUTIONS and WARNINGS.
b. While you operate, perform your during (D) PMCS. Observe all CAUTIONS and WARNINGS.
3-1
