TM 9-6115-669-13&P
5.13 TIME RELAY K14 MAINTENANCE.
This task covers:
a.
d.
Removal
b.
Inspection
c. Test
Installation
General Mechanics Tool Kit
(item 2, appendix B)
Automotive Fuel and Electrical System Repair,
Tool Kit (item 3, appendix B)
DC power supply, 24 VDC
Stop watch
Reference
Shut down Generator Set
150 kW, paragraph 2.8.1.
The Generator Sets 150 kW produce lethal voltages.
Turn off power to the EPP III or Generator Set 150 kw before
performing any installation removal, disassembly, or
assembly work.
Wear protective gloves when performing any work on main
assemblies of the EPP III.
CAUTION
Label all cables before removing electrical or electronic assemblies or
components.
a.
Remove stanchion by PDU (1, figure 5-14).
b.
Open access door (2) and secure with prop (3).
c. Install stanchion.
d.
Record labeling of cables from time relay K14 (8) and remove cables:
e.
Push out snap mount lock (7) with screwdriver; tilt time relay K14 (8) and remove from
mounting bar.
5 - 3 8