TM 9-6150-226-13
WARNING
High voltage is present in this system. DISE and
PDISE supports equipment using 120/208 V ac. Do
not rely on the color of the wire insulation for
phase color-coding.
The insulation on the wires
inside the cable jacket may vary, depending on
the supplier.
Wires will be marked with colored
tape
to designate
the phases.
Perform a
continuity
test to
verify
correct
phase
designation in accordance with the colored tape.
NOTES :
1.
ALL DIMENSIONS ARE IN INCHES, WITH THE METRIC EQUIVALENT IN PARENTHESES.
2.
CUT AND REMOVE CABLE AND WIRE INSULATION FROM CABLE ENDS AS INDICATED.
3.
INSTALL P1
PINS/SOCKETS
AND P2 CONNECTORS ON PROPER CABLE ENDS SO COLORS AND
MATCH AS FOLLOWS:
COLOR
FROM
TO
BLACK
P1-A
P2-A
WHITE
P1-N
P2-N
GREEN (OR BARE)
P1-G1
P2-G1
GREEN (OR BARE)
P1-G2
P2-G2
4.
VERIFY ELECTRICAL CONTINUITY FOR FROM - TO PATH WITH AN OHMMETER.
5.
CRIMP PINS/SOCKETS TO CABLE WIRES.
6.
ASSEMBLE P1 AND P2 CONNECTORS SO KEYS/KEYWAYS AND PIN/SOCKETS ALINE AS
INDICATED.
7.
MARK SLEEVES IN ACCORDANCE WITH MIL-M-60903 AS FOLLOWS:
97403-13226E7022-1
120/208 VAC
3 PHASE
60 AMP
FIGURE F-22.
60-amp, 100-ft (30.5m) service/feeder. (sheet 3 of 3)
F-61
